Real Estate Recap | November 14-20, 2026 | Mexico Beach - St. Joe Beach - WindMark

With Thanksgiving coming up, it was a quieter week on the market. We had 4 new listings hit the MB/SJB/WMB market, 3 properties going under contract, 10 price changes, and 5 sales closing for a total of over $5,000,000; one more property did come back on the market after falling out of contract. There was yet another $3,000,000+ sale, marking the 6th sale this year over that value, the most of any year ever. Let’s dive into the sales for the week.

632 Gulf Aire Dr

Moving West to St. Joe Beach, a renovated townhome in Gulf Aire went for $380,000 after 41 days on the market. The 3BR/3BA was built in 1999, but a lot had been updated, such as the flooring, paint, granite in the kitchen and baths, and an epoxy garage floor. At 1,710 sq ft, that’s $222.22/sq ft. The final number was 95.2% of list with no concessions. The neighborhood does not allow short-term rentals, and that keeps a ceiling on what these townhomes bring.

Link to Listing

632 Gulf Aire Dr
218 Dunes Dr

218 Dunes Dr

The top sale of the week, and most of the volume, came in Sugar Sand, where this brand-new Gulf-front home sold for $3,750,000. Built in 2025, it’s a 7BR/6.5BA with 4,141 sq ft of conditioned space (5,837 total), four Gulf-view primary suites, an elevator, and a raised private pool and hot tub. It sits on a 1.10-acre lot and sold fully furnished. It listed in February at $3,859,000 and never took a reduction. After 244 days, it closed $109,000 under list with financing, or $905.58 a foot. That’s two Gulf-front Sugar Sand homes over $3 million in a month.

Link to Listing

Lot 14 Ward St

Staying in St. Joe Beach, the only lot sale of the week was also the longest-marketed. This cleared 50×150 corner lot (0.17-acre) in the first block came on in May 2025 at $275,000 and sat for 492 days before going under contract. It finished at $205,000, $70,000 under where it started and about 89.5% of its final $229,000 list price. It’s in the X flood zone with Gulf views, no HOA, and county zoning allows site-built, modular, or mobile homes. Utilities are available in the area.

Link to Listing

Lot 14 Ward St
Dr Horton Sales

Dr Horton Sales

DR Horton closed two new homes in WindMark North this week for a combined $768,000. 1917 Backwater Rd is their Rhett plan (4BR/2BA, 1,799 sq ft), and it sold for $423,000 after 117 days. That’s $31,900 under a $454,900 list price, and $17,000 below the Rhett at 1885 Backwater Rd that closed for $440,000 in mid-October. Over on Sea Tern Ln, 337 Sea Tern Ln, a Sabal townhome (3BR/2.5BA, 1,460 sq ft), brought $345,000 cash after 147 days and one reduction from $359,900. The same plan at 349 Sea Tern Ln closed at its full $359,900 list just a week after that Rhett. Horton covered closing costs on both, $16,000 on the Rhett and $7,500 on the Sabal. The two homes finished almost even per square foot ($235.13 and $236.30), and each one came in under the last sale of its plan.

Link to Listing

Area Info/Market Updates

After doing an update on the rental market and going over some of the new changes coming to the State of Florida, I figured it was about time for an update regarding some of the projects going on in the area.

One big project that started this week was the Boat ramp extension, where they began demo work on the old walkway to add another ramp and a new seawall. I have attached a picture below of the demo work taking place.

Moving on to the pier… The City held its kickoff meeting with the engineer and contractor (Gorman) on Thursday. The official start date will be November 20, on which State agencies are notified. Ten days after the 20th (November 30) will be the date for actual commencement. Gorman indicated they will be renting a brand-new crane in order to minimize downtime, and I am all for it. November 30th cannot come soon enough.

Going back to the boating world, the canal continues to progress as the weeks go by. It looks as if the Coffer Dam is up, or very close to being up. A coffer dam is a temporary watertight enclosure that allows the work to be completed. A common question I get asked is whether the canal will remain open, and the answer to that is yes. GCUC promised to keep the canal open throughout the project.

One thing to keep an eye on is Parker Park. Over the last couple of City Council Meetings, they have talked at length about a beautification project, which would potentially involve walkways, landscaping, and a pavilion. This comes along with a new parking lot that was completed last week, allowing for more events. The end goal is to have a better venue and park to offer, instead of just a stage and a playground. It will be a long project, but it would be phenomenal for the area.

Area project update

Area project update

That’s all for this week’s market update. Thanks for reading, and go Dawgs!

Let's Connect

Looking to buy, sell, or just have a question? I'm always available to help and would love to work with you.

CONTACT ME